Rki-instruments EAGLE 2 Manual Uživatelský manuál Strana 194

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 309
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 193
184 ESM-01 Calibration EAGLE 2 Operator’s Manual
9. The EAGLE 2 will indicate that it is adjusting the zero reading for a few
seconds, then indicate that the operation is complete before returning to
the Calibration Mode Screen.
10. Install the demand flow regulator onto the multi-gas calibration cylinder.
11. Connect the sample tubing to the demand flow regulator.
12. Install the probe on the EAGLE 2 inlet fitting. Make sure the probe is
complete with internal O-ring and membrane and that the two halves of
the probe are tightened firmly together to avoid leaks that can affect the
calibration. See Figure 19 on page 76 for an illustration of the internal
parts of the probe.
ADJUSTING ZERO
RELEASE AIR BUTTON
ADJUSTING ZERO
COMPLETE
CALIBRATION MODE
AUTO CALIBRATION
SINGLE CALIBRATION
> PERFORM AIR ADJUST
NORMAL OPERATION
Zobrazit stránku 193
1 2 ... 189 190 191 192 193 194 195 196 197 198 199 ... 308 309

Komentáře k této Příručce

Žádné komentáře